Tuesday, May 3, 2011

Getting Ready to Seal the Tanks

Another productive day, we got a lot done! Continuing on the tanks we finished the installation of the vent lines and the capacitive senders. These weren't too difficult to install except for feeding the wire through the notched snap bushings and tightening the screws on the outboard capacitive senders. We also were able to get the flop tube installed in the left tank. Unfortunately we forgot to take a picture of how we safety wired the flop tube to the elbow AN fitting but it turned out looking great. In the next couple of days we'll hopefully have sealed tanks!

Sunday, May 1, 2011

Finished Installing Ribs in Fuel Tanks

Well it's been quite a while since I've posted anything new on here, but good news... all of the ribs are in the fuel tanks! Yes we have continued to work on the project, so don't lose hope in us. We've actually been making some pretty good strides in our progress! I've been busy with other things outside of RV building lately and haven't had the motivation to post lately but it's been too long since I've written!
These past few weeks we've been working away on the fuel tanks. These things are so much work! It's definitely messy work too. To have all of the ribs in is definitely a relief. We've had a few RV builders check out our work so far and they've all said the look like the shouldn't leak. Now all we have to do is finish the vent line and install the capacative fuel senders. These things are already almost complete so we should be sealing the tanks up soon!
To take a little break from the fuel tanks, we fabricated the pitot tube out of the supplied soft aluminum tubing. This thing was a piece of cake, we just double check how it is installed since you have a drill a hole through the main spar.

Thursday, March 3, 2011

Priming!

Finally! A day that Dad and I both had off and the weather was good! The weather forecast called for 65 degrees today but it ended up being about 72. We knew we were going to be able to get a lot done today, and we did! After the ritual breakfast at the cafe we headed over to the hangar to get to work.

We started by rolling all of our stuff out of the hangar (work bench for parts and paint, saw horses, air compressor, etc.) We used our normal process of preparing our parts, they were all previously Scotchbrited and we started with the Alumiprep today. Dad scrubs the parts to be primed, and I have the task of rinsing and drying the parts, then we set them all in position on our saw horses on top of a metal grate. There were a few clouds hiding the sun, but they blew in and out. Once the parts were all cleaned we immediately got to mixing our two part epoxy primer. This stuff isn't as nice as the self-etching stuff in the can, but it gets the job done. It took a good couple of hours to get all the parts primed and covered well. We primed the parts for the flaps as well as the aileron skins, a couple of wing ribs, the fuel tank baffles, and some fuel tank brackets. The difficult part is finding the spots that you missed. The primer is almost exactly the same color as the milky-white Alumipreped metal so you have to let it dry, then angle it to the sun to find the bare spots. It felt good to get these parts primed though! We've been waiting to do this for a while.

While we let the parts dry, we cleaned up our work area and got some stuff put away. We primed the aileron skins so we would be able to get the stiffeners (previously primed) riveted to them, and that's exactly the next step we did. We used the backdimpling method the plans call for and continued to work outside since it was such perfect weather. Our method consisted of filling four rows of rivet holes with rivets, taping them and then backriveting. Once the four rows were finished, we'd fill the next four rows and reuse the tape and so on. This way we were efficient and fast. Once the stiffeners were riveted we decided to call it a day and get heading home. The next step was to finish the bend in the aileron skins and our homemade bending break was at the house (it's already in the truck ready to go for tomorrow though) All in all we had a productive day, and only one rivet had to be drilled!

Tuesday, February 1, 2011

Leveling, Leveling, Leveling

Well today was all about preparation. As the title says, we spent most of our time leveling.. and driving all over town. We started out at the cafe as usual and got some breakfast with our friends then made our way to the hangar to see what all we needed to pick up. After that we decided to go to Home Depot to pick up a few things as well as a digital level since all of our levels are a decade old or so and beat up. Once we were at the depot we saw that prices of things have gone up so we decided to go to pay a visit to our friend Rick at trusty Ace Hardware! We picked up some aluminum angle for supporting the rear spar in the wing stand and we got a couple of eye bolts for the tie downs just to see how they fit. It looks awesome! Along with that we got a couple of plumb bobs (which we found later that we really don't need) to do some vertical squaring.
We headed on over to Sears to get the level and found a nice Craftsman for $35, it even beeps and tells the temperature of the room! This thing speaks two types of degrees. What else could you want from a level? After we finished there we headed back to the hangar to put our new tools to use. We found that our spars were about 0.2 degrees off at each end and we got this down to 0.0. We also modified our way of supporting the centers of the spars to keep the droop out. We continued using the hydraulic bottle jacks but decided to just use the screw portion. One of them was losing pressure over night and when we got to the hangar in the morning we found our blocks of wood on the floor. So now we have a longer 4x4 on top of the jack supporting the spars. Between the 4x4 is a 2x4 to spread out the weight more evenly. Our new way is fool proof! After that was set we decided to cut our aluminum angle to make the supports for the rear spar. In the process of cutting them our blade completely dulled and stopped cutting. I made a quick trip to Home Depot and picked up a new one, only to find that I got the wrong one. Well Dad and I went back and got the correct one and were able to get back to work. New blades cut so much nicer! We got our supports cut and mounted them to our wing stand in their proper place. After that we decided we should call it a day.
Productive day, just not as productive as we planned.
Update: We found a few builders have stressed about getting the 1/2" of twist or so out of the wing before putting the skins on but read that this is unnecessary. Clecoing the (pre-drilled) skins to the skeleton is supposed to pull it all square and not require manually taking the twist out. We'll see how this goes on Thursday and see if we do or do not need the plumb bobs.

Friday, January 28, 2011

Wing Drilling

Well these passed few days we've been getting quite a bit done on the project! Both wing walk doublers are cut and dimpled, all of the skins (except for the tanks) are drilled to the skeleton, and Dad's gotten all of the skins devinyled where needed. Teamwork! This part of the process is really exciting because everythings starting to look like something! It is a lot of repetitive work, but it's definitely fun. Tomorrow after work I'll be meeting Dad back at the airport and we'll get back to work!

Friday, January 14, 2011

Wing Walk Doubler

Today after work I headed straight to the airport to meet up with Dad. He was already waiting at the hangar and was get ready to work and so was I! We already had the wing skeleton in the stand but all we had to do was get it jacked up precisely to take the sag out of it. Got that done and started on the next project. Van's says the next step is to cut the wing walk doubler to size so that's exactly what we did. The plans call for the .025" sheet to be cut to 26" x 9/38". They also say that the doubler should overhang the rear spar by 1" but with it cut to 26" it only hung over by about 1/4". I wasn't too sure why this was or if it was important so I just cut it approx. 1" long. A couple of quick cuts with our friends brake and a nice wing walk doubler we had! After looking at other builder's websites tonight I found that everyone is cutting them to 26", next time I'm at the hangar I'll make sure to get that done.

Once we had the doubler cut we clamped it to the top inboard wing skin and match-drilled it. Then we were able to start clecoing things together. It's starting to look like a wing! We made quite a bit of progress tonight with the limited amount of time we had (we needed to get home to see the new Discovery channel Flying Wild Alaska) and we're definitely happy.

Thursday, January 13, 2011

Another productive day

After some quick breakfast and socializing today, Dad and I headed over the the hangar to continue where we left off on Tuesday. How lucky are we to have two of the same days off this week? We had to take advantage, and we did!

Today was much nicer weather wise and was perfect for priming. On Tuesday we didn't have the best of experiences with the primer, but today was much different. We were able to get the gun set up properly and we also thinned out the primer quite a bit. Last time too much was being laid down, but fixed that problem. Having a fine touch and a not too anxious trigger finger makes for a much nicer result. Instead of it being blotchy, our end results were smooth and even. It took us a while to get all of the bare metal covered though, the metal is almost the exact same color as the primer in certain light, so we had to look at it at quite a few angles.

Once the parts had a nice coating on them, we let them bake in the warm Californian sun. After about an hour the parts were ready to be handled and we started clecoing the ribs to the main spar. After a few minutes it started to look like a wing! Well, at least the skeleton of one... After making sure all of the ribs were in the correct place we started looking up rivet call-outs and got to riveting! It seems like it's been forever since we've set some of our favorite fasteners. The manual calls for the manufactured head of the rivet to be on the rib flange side, causing less distortion once the rivet is set. Once we started riveting we noticed that the anodization began to spider-web around the rivets we had just set. We called up the Van's builder assist hotline and asked them about it; turned out this is perfectly normal. The anodizing is just an extremely brittle coating on the spar and there have been no problems caused by this phenomenon. We continued on and after about 40 minutes of riveting the ribs were all mated to the main spar! We didn't spend too much time admiring though, we still had the rear spar to do as well. There are less rivets on the rear spar, and there's quite a few you have to leave blank for future assemblies to be put on. Once the rear spar was fastened we decided to pick the whole thing up and slap her onto the jig! After all, that's what it's there for. We got our jack out and pumped up the middle of the wing assembly until it was level and looking good and decided we would leave it there for the night. Tomorrow, the right wing!

Tuesday, January 11, 2011

Priming

Today we were finally able to get some priming done. We were skeptical at first though, since the weather wasn't exactly perfect but we proceeded to prepare the parts (i.e. Alumiprep, scrub, and rinse) and get them ready. Temperature was about 64 degrees, but there was a very high overcast. We figured we would be OK with the few patches of sunlight that occassionaly broke through. It was our first time using this new primer, which is an epoxy-based primer that is mixed with a hardener, it was also the first time we used our HVLP spray gun. Needless to say, our day was interesting and involved experimenting.

Preparing the main ribs and leading edge ribs (leaving out the fuel tank ribs) took us about two hours. Once we had everything prepared and set up we decided to plunge into the
priming. The new primer is completely different from the self-etching stuff that we're used to. It was almost like peanut butter until you got it completely stirred and mixed. We started off by mixing 5 oz. of the primer and an equal part of hardener and we thought this would finish most of the job. Not the case. After about 35 oz of mix we only got the top of the ribs done. We definitely have to experiment with the gun a bit, because it was just putting too much liquid out. Plus the weather wasn't perfectly ideal, so we decided to just leave it to the top of the ribs for today and call it a day. We took the three racks of ribs (not baby back) to one of the rooms of the hangar that we heated up with a space heater to help with the curing process.

Our next day off is Thursday so we'll see what we can get done then. Hopefully the weather is more suited for priming.

Saturday, November 13, 2010

Wing Jig Work

Jeez, it's been nine days since I've put a new post out for the RV, and that's way too long! For the past few days Dad and I have been preparing the rest of the ribs and have gotten them all ready to be primed. We're trying to build up a pretty good sized pile just so we can knock a lot of the priming out at once. Since this'll be the first time we use our spray gun (we've been using cans of self etching primer) we want to make sure we have enough parts to make it an efficient process. Dad banged out most of the rib preparation and I helped him when I could. I've been working quite a bit lately and going to school and I've been having a hard time to put into the project. But this semester is almost over and I'll have more time!

Also, we were able to construct the wing jig. The thing is as sturdy as a house, and it came out very straight. We used lumber to construct ours, and it's a shame that this won't have much use once the wing is done, but it'll serve it's purpose. We've been contemplating on how to do our conduit holes in the ribs and we've decided we're going to use 3/4" thin-walled PVC pipe. We picked up three 10' pieces at Lowe's yesterday, but they must have been marked wrong because they're 1"! Oh well, a quick return and we'll be back in business. Hopefully we'll be able to prime soon and get the wing set on the jig!

Tuesday, November 2, 2010

Match Drilled Wing Ribs

Well today dad and I were able to get the ribs all match drilled to the main and rear spar and we have something that resembles a wing! We only had enough time to do the left wing, but we also got all of the ribs prepared for priming. We're not too sure if we're being to picky on the scratches, but we're making sure we get all of the scratches out with either scotchbrite or sandpaper if the scratch is deep enough.


The ribs don't have an alclad layer on them, so they don't have a protective film on them when they are packed so we want to make sure we have them nice and buffed out before we spray them with primer. Tomorrow we should be able to get the right wing done as well.

Tuesday, October 26, 2010

Riveted Rear Spar Components, Continued Rib Prep.

Well today Dad and I woke up bright and early and decided to head over to the airport to get some breakfast, after an egg sandwich and a couple cups of coffee we headed on over to visit our friends Jack and Dick. They were at their hangar working on Dwayne's airplane and we got to fill our heads with some more good ideas, it's great being surrounded by RV people!

I only had a limited time at the airport this morning because I had to go to school, and wouldn't you know it, when I got there my first class was cancled.. perfect! I could've put those couple of hours in to working on the project! Oh well, I went to my moms for a while and took care of a few things at her house.

After school I made a B-line straight for the airport to meet up with Dad at the hangar. When I got there he had already been deburring the wing ribs and had primed the rear spar, awesome! With this finished we made sure to get straight to riveting the doublers to the rear spar. We attempted to use the pneumatic squeezer that our friend let us borrow, but we couldn't get it to squeeze the -4 rivets. We shimmed up the rivet sets and cranked up the pressure on the compressor but it still wasn't doing it's job. Instead we hooked up the rivet gun and bucked all of the rivets, definitely good practice for when the skins come. We taped off the holes in the rear spar that also get ribs and the flap brace so we don't accidently fill them early.

Once we had the rear spar components all riveted together we moved back to rib preparation. We already had 14 of the leading edge ribs done (fuel tank ribs) and moved on to the wing leading edge ribs. After about a couple of hours of work we had finished flanging and fluting the leading edge ribs, and once this was done we marked the rest of the ribs to get them ready for flanging and fluting.

All in all we had a great day and it was definitely productive. With two of us working together on this we feel like we have a pretty good pace going. Can't wait to get back to the hangar!

Monday, October 25, 2010

Rib Work

Wow, so it's been a while since I've put anything new up, but we're still making good strides on the RV! No pictures to post today but since the last post we've finished the rear spar components and began working on the many ribs. So far we've gotten all of the ribs deburred and now all they need is to have their flanges straightened, and to be fluted. Tomorrow we'll be priming the rear spars (all of the doublers and the tie downs have been primed) and we'll hopefully get the doublers all riveted on.

Today I was able to continue the work on the leading edge ribs and got 14 of them fluted and their flanges trued. This process proves to be pretty tedious but I've found a good system that I'll be using to finish the rest of the ribs. Can't wait to get back to the project and make more progress!

Sunday, October 17, 2010

Finished Tie Downs, Began Rear Spar

Today right after work I went straight to the hangar to meet up with dad and get to work on the airplane. As soon as I got there we banged out that last tie down. We match drilled it to the spar once it was nice and square, then once that was done we drilled the spacers and prepared it all for the platenuts. All we have to do to finish them off is put some primer on them. Since the weather has been cloudy and cool we're waiting until a warm day to finish the tie downs.

We moved to the rear spar and we cut the doublers that attach to the rear spar, once we had a rough cut on the four pieces we dressed them up on the scotchbrite wheel and they're looking nice. That was all we were able to accomplish today, but for a couple hours of work we definitely satisfied. I have to be to work at 5 tomorrow morning but I'll be at the hangar right after to get back to work!

Also, the platenuts are all installed in the main spar. At least all of the platenuts that attach the fuel tanks, inspection plates, and the inboard ones.

Tuesday, October 12, 2010

Platenut Work for Fuel Tanks


What a great day today. Found out I got one of the three A's on the previous tests in my geography class, got to hang out with my girlfriend and my dad, and we had dinner together at the airport! Dad and I also got to finish the platenuts for the fuel tanks. As well as countersinking the screw holes. The process in which we secured the platenuts was as follows.





1) Drill all #40 holes.
2) Countersink all rivet holes.
3)Cleco platenuts on, then rivet.
4) Drill screw holes.
5) Countersink screw holes.



We countersunk the screw holes last because the plans suggest using a #30 countersink cutter in the hole, which is I believe a #12. If there's nothing to keep the cutter centered (platenut) then you will be left with a hole that's less than concentric. After a while of countersinking I finally found a method for countersinking that produces great results. Instead of using the air drill, we switched to our $15 corded drill and set it at a slow speed. Instead of obliterating the metal into dust producing somewhat nice results, it slowly cuts the metal and leaves great results. The only real tedious part of this job was getting the countersink cage set to the proper depth, but once it was set it was smooth sailing. After a few hours of work, the first step of the wing kit is complete. Tomorrow we'll be starting the nut plates for the access plates after we get out of work. Excited to be back in action!

Saturday, October 9, 2010

Fuel Tank Platenuts

Today we had a productive day and got some more work done on the main spar. After pondering over the plans for a while we finally got to drilling and countersinking for the platenuts that will hold the fuel tanks on. Once we had this done we began riveting them on. This was also the first time I got to use a pneumatic squeezer! Our friend is letting us borrow his and the thing is amazing, although it takes a bit of getting used to. But it's definitely easier than squeezing each rivet by hand! Today we were only able to finish the top platenuts but plan on finishing the bottom on Tuesday. It feels great to be back in the building zone again, can't wait to get back to the hangar!

Thursday, October 7, 2010

Wing Inventory

Today once school was done I made my B-line straight for the airport to meet up with dad. Today we finally got to get back to work on the RV after about 13 weeks or so. We inventoried the kit and organized all of our rivets and fasteners, an astronomical amount compared to what comes in the empennage kit. Once all of the small parts were out we made room on the workbench for the main spars so we could inspect them. They looked flawless! Great job at Van's for sure, just a couple of buffing marks but nothing at all to worry about.


Though we did get one rib that was a bit bent up towards the end, we're thinking we'll be able to true it back to its original shape. We also got the spars clamped to the workbench so we can start the task of countersinking for the platenuts. Other than that there's not too much to report, but we're both stoked to get back to work!

Tuesday, October 5, 2010

Wings Arrived!

Well today was the day! Our wing kit has finally arrived. Though I was unable to witness it (school and work) Dad had the honors of accepting the order. Inventory shall start on Thursday right after school, and we can't wait!